Reprints from my posting to SAN-Tech Mailing List and ...

2011/06/10

[san-tech][02462] Re: 講演資料:Building the Data Center of the Future, 2010/06/23, 24

Date: Thu, 15 Jul 2010 11:59:27 +0900
--------------------------------------------------
[san-tech][02459] 講演資料:Building the Data Center of the Future, 2010/06/23, 24

> "Keynote: The Future of High Performance Computing: A Data Center Perspective"
>  Michael J. Ellsworth, Jr., IBM
>   http://gladiator.ncsa.illinois.edu/PDFs/datacenter/10/ellsworth.pdf
>
Page 21から Page 22で UPSがカットされています。

これは事前に、National Petascale Computing Facility (建物) について、
以下の同意がされているからです:



National Petascale Computing Facility
  http://www.ncsa.illinois.edu/AboutUs/Facilities/npcf.html

  "NPCF's 20,000-square-foot raised floor data center will house the
   Blue Waters sustained-petaflop supercomputer and other computing,
   networking, and data systems, while the remainder of the building
   provides space for 40 staff members."

NPCF will:
  "Offer top-flight physical and cybersecurity, including monitoring of
   all exit bandwidth, deep packet inspection, and tracking of network
   flows.”

  "Take advantage of the campus' highly reliable electrical supply,
   chilled water distribution system and thermal storage."

  "Have a limited UPS system for NCSA's mass storage system and other
   selected equipment."

  "Provide 1 or 10 gigabit high-performance Ethernet connections as
   required with up to 300 gigabit external network."

Blue Waters computing system
  http://www.ncsa.illinois.edu/BlueWaters/system.html
"Power 7 for Scientific Computing"
  http://www.ncsa.illinois.edu/BlueWaters/pdfs/snir-power7.pdf


これだけの規模の HPCをフルにまかなう UPSを設置したら、その費用 (部材・
設置スペース・放熱対策) が莫大になってしまいますね。

0 件のコメント:

コメントを投稿